Product-development illustration; not a record of a specific XGRAPHENE facility or project.
Solutions
Decide how much of the heating system you want to own. We supply the rest — as film, as a module, as a complete unit, or as a joint development programme.
Direct answer
The film is the same. What changes is how much integration work sits on your side of the fence.
| Delivery format | Who it suits | What you provide | Typical timeline |
|---|---|---|---|
| Bare film | Customers who already laminate, connectorise and assemble in-house | Drawing, voltage, power, substrate choice | Per project |
| Encapsulated module | Customers who want a part that drops into an existing line | Drawing, connector type, sealing requirement | Per project |
| Complete unit | Customers who want a controlled sub-assembly, including sensing | Target temperature, control strategy, enclosure constraints | Per project |
| Joint development | Customers whose product does not exist yet | Product concept, performance target, programme timing | Per project |
Custom quote per project · Samples in about 1 week · MOQ 5 pcs
What can change
Everything that affects fit, power or assembly is set per project. Nothing here is a catalogue part number.
Length, width, cut-outs and outline. Per project.
Set by the resistance per unit area your supply requires. Per project.
Connector type and exit position, sealing and protection. Per project.
Quality and testing
Film-level data and panel-level data are published separately, each with its report, method and conditions.
OEM or ODM
OEM means we build to your drawing. ODM means we develop the module with you and you brand it. The commercial and IP terms differ.
Read the full comparison: OEM vs ODM for graphene heating film →
Built already
Each one states its measurement conditions.
220-point thermal map on a 0.5 × 1.1 m panel
Cabin module built to a partner drawing
Multi-zone panel for a large floor area
Find it by application or constraint
Start from what you are building, or from the engineering constraint holding the design back.
By application
Include the product, heating area, supply voltage, target temperature and expected volume. We reply with a film configuration and a project-specific quote.
Request a Quote